County Road 105 – Bridge Rehabilitation

The goal of the project was to remove the existing asphalt and deteriorated concrete on the bridge deck and patch it back. The same process was completed underneath the bridge. A sound test was conducted to identify deteriorated concrete, followed by removal and patching on the abutments and girders. Additionally, we installed a waterproofing membrane and sealed the bridge deck before repaving.