Projects

The main objective of this project was to enhance drainage and usability of alleys while mitigating their deterioration . It was achieved through grading the alleys and applying surface stabilization product. The project included various provisions, including grading, soil removal and disposal, hauling and placing aggregate and asphalt millings, compaction, tree and bush trimming, weed removal, structural adjustments, and the application of soil stabilization product.
The primary objective of this project was to ensure drainage around the Tire center building by installing new storm trench drain with area inlet and storm manhole.
The goal of the project was to remove the existing asphalt and deteriorated concrete on the bridge deck and patch it back. The same process was completed underneath the bridge. A sound test was conducted to identify deteriorated concrete, followed by removal and patching on the abutments and girders. Additionally, we installed a waterproofing membrane and sealed the bridge deck before repaving.
The 2021 Roadside Safety Improvements project aimed to enhance pedestrian and vehicular safety across multiple locations by installing guardrails. The comprehensive scope of work included clearing and grubbing, constructing MGS guardrails, transitions, and end anchorages. Additionally, the project involved building concrete sidewalks and curb ramps, preparing subgrades, performing minor grading, and restoring landscaping .
The main objective of this project was to construct a drainage system that directd water to the roadway through a curb cut. The improvements included removing the existing fill and constructing a drainage ditch lined with rip rap.