County Road 105 – Bridge Rehabilitation
Project Description
The goal of the project was to remove the existing asphalt and deteriorated concrete on the bridge deck and patch it back. The same process was completed underneath the bridge. A sound test was conducted to identify deteriorated concrete, followed by removal and patching on the abutments and girders. Additionally, we installed a waterproofing membrane and sealed the bridge deck before repaving.
Client reference
Morbi et tincidunt turpis, et auctor purus. Quisque cursus sit amet risus non sodales. In sit amet nisl mattis ex molestie volutpat sit amet quis diam. Duis non fringilla neque. Proin finibus rhoncus viverra. Aliquam laoreet nulla risus, id accumsan augue tincidunt vitae. Aliquam tincidunt vitae justo at facilisis. Proin id nisi urna. Donec cursus sodales libero id dignissim. Interdum et malesuada fames ac ante ipsum primis in faucibus. Maecenas in justo vel elit congue condimentum.